01

Site and brief

We start with your land, your goals and your numbers.

  • Site visit and constraints review: zoning, services, access, geotech
  • Your brief, budget and target return or move-in date
  • Go / no-go view on what the site can realistically deliver
02

Feasibility and design

Design developed with the build in mind from day one.

  • Concept options compared on yield, cost and buildability
  • AI-assisted quantities and early cost checks
  • Design locked in the order the site will need it
03

Consents and procurement

Paperwork and trades lined up before the clock starts.

  • Resource and building consent management
  • Trade packages structured around the Takt plan
  • Long-lead materials and offsite components ordered early
04

Takt plan

Your project broken into zones, with a fixed rhythm for every trade.

  • Zones and takt time set from the actual design
  • Trade sequence balanced so no one waits on anyone
  • A programme everyone on site understands at a glance
05

Build

Production on site, measured daily.

  • Daily huddles at the takt board; weekly look-aheads
  • Constraints cleared before they hit the site
  • AI-assisted progress reporting so you always know where things stand
06

Handover

Finished properly, signed off and documented.

  • Quality checks built into every zone, not left to the end
  • S223/224, CCC and code compliance documentation
  • Complete as-built and maintenance information
What you get

What changes for you as the owner.

Speed

A shorter, steadier programme

Trades flow through the site without stacking up or standing idle, so the build moves at a pace that's planned, not hoped for.

Certainty

You know where it stands

Progress is measured zone by zone every day. Slippage shows up in days, not months, while it can still be fixed.

Accountability

One team to talk to

No finger-pointing between designer, planner and builder. One team owns the outcome.

Quality

Quality built in zone by zone

Each zone is checked before the next trade moves in, so defects don't pile up at the end.

Questions

What owners usually ask.

What is Takt Planning, in plain terms?

It's a way of running a construction site like a production line. The building is split into zones of similar work. Each trade gets a fixed amount of time per zone, the takt, and then moves on to the next, with the next trade following behind. The result is steady flow, less waiting and a programme you can check every day.

Where does AI come in?

Behind the scenes. We use AI to speed up design options, quantities, scheduling, look-aheads and reporting, so the team spends its time on decisions and the site instead of on paperwork. You get faster answers and clearer updates.

Do you only do design and build, or can we bring our own designer?

Both work. Our strongest results come when design, planning and build sit with one team. If you already have a design, we can take it from there and plan and build it with Takt.

Where do you work?

We're based in New Zealand and work wherever the project is. Our team's experience spans New Zealand, the Middle East, South Africa and Angola.

How do we start?

Send a short note through the Start a project page. We come back within two working days to talk through your site and what you're planning.

Start a project

Have a site or a project in mind?

Tell us what you're planning. We'll come back within two working days with how we'd approach it and what it would take to deliver.